The New E-S4HCON2022 2023 Updated Verified Study Guides & Best Courses [Q34-Q50]

Share

The New E-S4HCON2022 2023 Updated Verified Study Guides & Best Courses

Authentic E-S4HCON2022 Exam Dumps PDF - 2023 Updated


SAP E-S4HCON2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion
  • Perform the SUM execution part, including DMO
Topic 2
  • Describe and perform the actions necessary during the SAP S
  • 4HANA conversion prepare phase
  • Monitor and troubleshoot the SUM procedure
Topic 3
  • Describe the factors influencing downtime and techniques to reduce downtime
  • SAP S
  • 4HANA Conversion Prepare Phase
Topic 4
  • Describe the necessary manual preparation and follow-on activities for SUM
  • SUM Monitoring and Troubleshooting
Topic 5
  • Perform the modification adjustment with SPDD and SPAU
  • Handling of an SAP System Landscape

 

NEW QUESTION 34
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Delete client 066 (Early Watch Client)
  • B. Install add-on SAP Gateway 7.50
  • C. Uninstall Fiori apps not released for SAP_UI 7.50
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: A,C

 

NEW QUESTION 35
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Release upgrade
  • B. Dual Stack split
  • C. Support Package Stack update
  • D. Database migration
  • E. Homogenous system copy

Answer: A,C,D

 

NEW QUESTION 36
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Upgrading to SAP ECC 6.08 without using DMO
  • C. Updating to SAP ECC 6.07 using DMO
  • D. Using DMO when applying Support Packages to SAP ECC 6.07

Answer: A,B

 

NEW QUESTION 37
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: C

 

NEW QUESTION 38
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the main configuration option "Standard" when applying SAP Support Packages
  • C. Using the database migration option (DMO) for SUM
  • D. Using the main configuration option "Single System" when installing an Add-On

Answer: D

 

NEW QUESTION 39
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: A

 

NEW QUESTION 40
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B

 

NEW QUESTION 41
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. A change of the database type is performed, without changing the software components.
  • B. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • D. An upgrade of the software components is performed, without changing the database type.

Answer: A

 

NEW QUESTION 42
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Network capacity between exporting and importing R3load processes must be.
  • B. The target database size increases temporarily because of the Shadow Repository.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The source system is non-Unicode and the target database is a scale-out system.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E

 

NEW QUESTION 43
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

 

NEW QUESTION 44
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and memory pipes
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and network socket connection

Answer: A

 

NEW QUESTION 45
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_IMPORT_ALL
  • B. EU_CLONE_MIG_DT_RUN
  • C. EU_CLONE_MIG_SOT_RUN
  • D. EU_CLONE_MIG_DT_CREATE

Answer: B

 

NEW QUESTION 46
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need to build up a SI check framework by applying SAP notes.
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

Answer: A,C

 

NEW QUESTION 47
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • D. The upgrade of the PRD must be finished before you start new development in the DEV.

Answer: C

 

NEW QUESTION 48
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SWPM using the Backup / Restore procedure
  • B. SWPM using the Load procedure
  • C. SUM with DMO
  • D. SUM without DMO

Answer: B

 

NEW QUESTION 49
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. SAP S/4HANA Server 1809 and above
  • B. SAP ECC system from SAP ERP 6.0 EHP 8
  • C. SAP Solution Manager 7.2
  • D. Standalone AS ABAP with SAP_BASIS 752 and above

Answer: A,D

 

NEW QUESTION 50
......

Get Prepared for Your E-S4HCON2022 Exam With Actual 75 Questions: https://exam-hub.prepawayexam.com/SAP/braindumps.E-S4HCON2022.ete.file.html